![]() ^ "Sou', Sou'west." Los Angeles Times.The route cut through Fort Moore Hill and made it necessary for a Broadway overpass to be built across the freeway at the former Broadway Tunnel site. It was demolished for the construction of the new Hollywood Freeway (U.S. The Broadway Tunnel was closed on June 2, 1949. Due to the importance of the artery of travel, through which thousands of automobiles, teams and pedestrians would be passing daily, an event was held on Saturday, February 19, formally turning the tunnel over to the city, with the Automobile Club of Southern California in charge. The work was completed and the Broadway Tunnel reopened in early February 1916. The stairway on the outer face of the southern portal was extended to a rise of 65 feet (20 m) to Fort Moore Hill. The concrete archway of the Broadway Tunnel was 20 feet (6.1 m) high, and the entire bore was lined with white glazed tile. Because of the lowering, it was necessary to make a cut of 14 feet (4.3 m) in California Street, and to change the grade of North Broadway from Temple Street to the tunnel. The roadway was lowered to decrease the grade, wood block flooring was installed to provide a noiseless surface for the traffic of teams and automobiles, and a false roof built inside the original shell. The Broadway Tunnel was closed for reconstruction in 1915. The cost in its construction was $66,000. It was 760 feet (230 m) long, 40 feet (12 m) wide and 22 feet (6.7 m) high, with a grade of 6 in 100, falling toward the east. The Broadway Tunnel was completed and opened for traffic on Saturday, August 17, 1901. According to an article in the Los Angeles Times, the Third Street Tunnel, which was also nearing completion at the time, could have been put inside the Broadway Tunnel leaving enough room for a sidewalk 8 feet (2.4 m) wide. With the exception of the tunnel in Fairmount Park in Philadelphia, which was 41 feet (12 m) in diameter, but only 140 feet (43 m) long, the Broadway Tunnel was the widest tunnel of its type in the U.S., and possibly in the world, at that time. The tunnel required more than 50,000 cubic yards (38 227.75 m 3) of elevation, 4,000 cubic yards (3 058.22 m 3) of concrete and 1.25 million of bricks to line it. The wood bracing fell over the man in such a manner that he was saved from being crushed to death. On the morning of January 20, 1900, a laborer was buried under about 20 tons of earth at the north end of the tunnel. About 25 men with teams (of animals) moved obstructions out of the way in preparation for the excavation, from the north approach. Work began on the Broadway Tunnel on November 2, 1899. The main argument for its construction was that a tunnel providing an additional opening on the north would lessen the constantly increasing traffic (horses, buggies and wagons), which was causing a dangerous jam at the corner of First and Spring Streets. Plans were prepared by the city engineer's office in early March 1895. A proposal for opening Broadway through to Buena Vista Street and extending the street south into what was then part of Main Street, below Tenth Street - to give a continuous, wide thoroughfare from the southern city limits to the Eastside - was made as early as February 1891.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |